The main task of the architect is the development or one or more ideas with an abundance of possible variants … Más
Mes: mayo 2012
BIM-TOOL FOR INTEGRATED DESIGN (II)
In particular since the 1973 energy crisis, the requirements applied to buildings have become continuously more stringent while the buildings … Más
BIM- TOOL FOR INTEGRATED DESIGN
The traditional approach to project design, even on major projects involving several different architects, designers and engineers, is for each … Más
REVIT ARCHITECTURE (1) -SELECCIÓN DE OBJETOS Y NAVEGACIÓN POR LAS VISTAS (II)
Controles de volteo Se hace clic sobre el control de volteo para cambiar la orientación de un elemento. Los controles … Más
Debe estar conectado para enviar un comentario.